This project was done as a sub to Science Applications International Corp. (SAIC). HMS installed over 350 miles of duct bank, vaults, and fiber optic cable, ranging from 12 counts to 432 count. Along with the termination shelters and end equipment. This installation was performed at Ft. Irwin, the Army National Training Center. The project enhanced training and communication capabilities at that installation. This contract was completed in 2008.
Project Details
Owner Name – US Army
1st free appointment, the first step for your project