Work under this contract included the installation of a new electrical package to replace the existing substation. This bid-build project relied heavily on HMS’s input for added-value design changes that were incorporated to eliminate electrical power disruptions to patient care. Work included site work, concrete, and turn-key construction of a new building to house new low and medium-voltage equipment. Demolition of the old substation couldn’t happen until the new substation was complete and energized. There were over 70 existing electrical panelboards feeding over 1,000 circuits that had to be cut over. The electrical package included 15Kv & 4.16Kv medium voltage assemblies for both normal and emergency power, 8- 1200A switchboards, multiple 1200A closed transition ATSs, and integration of all electrical equipment into the campus-wide power monitoring system. The new building design was metal stud construction and included HVAC, lighting and fire protection systems.
To provide the best experience, we use technologies like cookies to store and/or access device information. By clicking "Accept All", you consent to our use of cookies to process data for observing site usage and marketing efforts. You can manage your preferences or withdraw your consent at any time by clicking “Preferences”.